Design Review: A Student Footbridge Project

IELTS Listening Practice

medium

Audio

You can replay the recording as many times as you like while practising.

Questions

Question 1

Choose the correct letter, A, B or C.

1
They chose a beam bridge because a suspension design was
Question 2

Choose the correct letter, A, B or C.

2
According to Yasmin, weathering steel's key benefit is that
Question 3

Choose the correct letter, A, B or C.

3
The live-load calculation failed to account for
Questions 4–6

Who will carry out each revision?

Options
  • A. Yasmin
  • B. Tom
  • C. Dr Price
4
redoing the live-load calculations
5
updating the technical drawings
6
reviewing the cost estimate
Questions 7–9

Complete the sentences below.

7
To control the vibration, they will add a ______ rather than more steel.(max 1 word)
8
The footbridge must cross a gap of ______ metres.(max 1 word)
9
The revised package is due by the end of week ______.(max 1 word)
0 / 9 answered